Testimonial
|
| We
are very pleased with the amazing speed at which General
Patterns team responded to our critical timeline
they saved the day!
Dean Gebhart
|
|
|
Case
History
|
|
Triton
ATM Machine
|
|
Problem/Challenge
|
Bridge
Production
|
|
Already well known for its kiosk style
ATM machines, Triton, the second largest manufacturer
of ATM machines, was anxious to launch the FT5000; a
new thru-the-wall unit. The introduction timing was
to coincide with a national show. Everything was ready,
except last minute changes caused a delay in the plastic
front cover. With a little less than four weeks until
the show, the program was in serious trouble.
|
|
Solutions/Results
|
Rapid
Tooling
|
|
General Patterns Rapid Tooling
Center is equipped with high speed milling capabilities
for tooling in excess of 40 x 100. This
coupled with a state-of-the-art structural foam plant
(with machines over 1500 ton) enabled General Pattern
to meet this challenge head-on. In addition, General
Patterns in-house painting facility allowed us
to deliver production representative parts in less than
3 weeks!
|
|
Benefit/Impact
|
Injection
Moulding
|
|
Not only did Triton launch the FT5000
on time, but with only minor upgrades, the tooling was
converted from Prototype to Production; eliminating
the cost and time associated with re-tooling. Today
General Pattern is producing over 2000 units a year
and Triton has a one-stop solution for its low
volume production needs.
|
|
Commercial
|
|
|
Prototype
Tool Price
|
$48,000 |
|
Upgrade to
Production Tooling
|
$6,800 |
|
Performance
|
3
weeks - tooling and 30 sets of parts. |
|